600 tonnes of high-strength industrial flow screed

Renovation of production facilities in Allgäu

Project Summary

The Allgäu-based company Hymer-Leichtmetallbauer chose the high-strength, cement-based industrial flow screed weber.floor 4605 to renovate its 1960s production facilities.

First, the RAUER Bau- und Betonsanierung team removed the old industrial floors and prepared the surface by milling and shot blasting. As the production facility floors have to withstand heavy loads, a cement-based industrial floor coating was then applied to the screed.

A total of 600 tonnes of material was installed within a few weeks using the Weber MixMobil and the Weber PumpTrucks.

Construction site:
Production facilities

Investor
Hymer-Leichtmetallbau GmbH & Co. KG, Wangen im Allgäu

Completion:
March 2022

Applicator:
RAUER Bau- und Betonsanierungs GmbH, Dietenheim

Surface
30.000 m²