Construction of municipal swimming pool
Move and feel good in the swimming pool and sauna area.
In the city of Oschersleben (Federal State of Saxony-Anhalt), the municipal swimming pool had become so far outdated that renovation was no longer profitable. So, a completely new building with three swimming pools and a sauna area was planned and executed elsewhere.
The municipality decided on tiles in a size of 30 x 60 cm with a dark grey colour. These are rather unusual for swimming pool halls, but they exude a special charm and visually enhance the swimming area. emanate a special charm and optically
Thanks to modern laying systems, the professional tiler Hausmann and his team were able to complete the work on time before the start of the season.
Building site:
Swimming hall, Oschersleben
Investor:
BEWOS Wobau GmbH, Oschersleben
Surface:
Approx. 3.500 m²
Completion date:
March 2022
Applicator:
Fliesenlegermeister Hausmann GmbH, Oschersleben
Download
- Brochure Referenzblatt Schwimmhalle Oschersleben (PDF - 316,28 KB) Download • Send